| Accellerator (Indiana) |
Reception Area (Indiana) |
|
|
|
Site Demo Complete 12/10/07 (Ohio) |
32 Tons of Rebar!! |
|
|
|
Framing of vault walls |
Again, 32 Tons of Rebar!! |
|
|
|
Vault ceiling framed |
Fully framed
and poured vault 1/10/08 |
|
|
| 8 foot thick
wall of concrete; total concrete: 588,000 pounds |
Base frame delivery 2/5/08 |
|
|
|
Hallway leading to vault |
Base frame installed; vault insulated and drywalled |
|
|
|
Covered entrance (Maryland) |
Waiting area |
|
|
|
Completed vault with Clinac (Maryland) |
All lead vault (Pennsylvania) |
| |